    11/07/2006

    Painting

    Interior and exterior of entire building

    Caulk Joints around building

    Doors

    Replacement of exterior doors that are rusted with fiberglass

    Re-stain/paint doors that are damaged or show wear

    Install kick plates on all doors

    Door hardware

    Thresholds

    Panic hardware/exterior excursions

    Hinges

    Weather stripping

    Door Sweeps/Rain Drip (top and bottom)

    Door closers

    Replace door handles to comply with ADA

    Room Signage

    As needed

    Ceiling Tiles

    Water damaged/discolored

    Lighting

    Retrofit to updated energy saving:

    Ballasts

    Fixtures

    Motion sensors

    Timers

    Walkway lighting

    Replace all incandescent

    Pigeon Clean-up-wires/netting
    Power wash and seal outside of building
    Plumbing
    7 year replacement

    Faucets, p/traps, isolation valves

    14 Year replacement

    Urinals, commodes, water heaters

    Restroom Counter tops/Stalls

    (To comply with ADA)-Will be done every 14 years after initial restoration

    Carpet replacement

    14 years after initial restoration/on needed basis only

    Roof Replacement

    14 years

    Furniture Replacement

    21 years